Commissioning

Server Room Blowers

Sun Microsystems Customer Solutions Center is one of many data centers that we have commissioned. It is often difficult to commission data center HVAC systems because the heat load does not come in until long after we are complete.

On many projects we work with the electrician to perform load bank tests to fully test the mechanical system before the critical customer equipment is installed.

Western Allied understands that a mechanical system is not complete until it is operating. So many facilities have systems that are not functioning efficiently as possible because of incomplete start-up of equipment or expedient control installation and testing.

We have made the commitment to make sure mechanical systems that we install are commissioned. Integrating our N.E.B.B. certified start-up, test, and balance staff; DDC controls department; engineering staff; and multiple A.E.E. certified building commissioning professionals; we have developed commissioning procedures for every level of installation.

From a single package unit job, to a full FDA validated cGMP suite, to LEED projects, we have the expertise to commission any job.


Elan Laboratory

Elan Pharmaceuticals - Fully commissioned and functionally testing by Western Allied.