Project Summary
At the 2000 Sierra Point Tower project, WAM applied the same level of foresight at a larger scale, supporting the conversion of an approximately 250,000 SF, 12-story office building into an all-electric facility designed to accommodate future laboratory buildouts. The design incorporates air-source heat pumps producing chilled and hot water for lab floors, heat recovery at rooftop lab exhaust systems, and new risers installed through an existing elevator shaft to enable future expansion. New 100% outside air handling units and a modern building management system were implemented to optimize performance, flexibility, and energy efficiency. Together, these strategies established a scalable, fully electrified infrastructure designed to deliver lasting value.
Decarbonization and electrification in sustainable construction are no longer overlooked because of cost—they are now immediate priorities shaping how buildings are planned, designed, and delivered. Our work reflects a commitment to helping clients move confidently toward sustainable solutions without compromising performance, cost, or lasting quality.
Market Sectors
- Sustainable Building
Services
- Engineering
- Mechanical
- Special Projects
- BIM/VDC