We’re Hiring!

Why You Want to Work for Western Allied Mechanical

CZI Advanced Biomedical Imaging Institute

Redwood City, CA
Project Summary

This is a design assist TI project. The project involved modification of existing HVAC system to support the new lab spaces. The project included installation of process chiller on the roof with new exhaust fans and sound attenuation to meet project requirements. The construction in an existing building with limited overhead space for installation requirements of a Cryo EM microscope suite made construction challenging. The building space was shared with another tenant. The entire team was proactive in planning shutdown ahead of time to minimize disruption to adjacent space, nearby buildings and homes around the areas.

Market Sectors
  • Life Sciences
Services
  • Mechanical
  • Plumbing
Connect With Us

Let us know about your next project or partnering needs.