Project Summary
WAM is currently leading the design and build of a robust backup cooling system for an existing data center, serving as the prime contractor and spearheading all construction efforts. This high-performance system features a new 45,000 CFM air handler, a 120-ton air-cooled chiller, and chilled water pump skid—engineered to ensure optimal reliability and efficiency for critical infrastructure.