Project Summary
This project consisted of an all-electric mechanical system supporting the conversion of an existing high rise office building to 50-50 lab-office use. We installed new rooftop equipment including a 400-ton water-cooled chiller, cooling tower, 480-tons of air to water heat pumps providing CHW & HHW to lab floors, lab exhaust fans connected to heat recovery unit, and lab exhaust riser down former elevator shaft.
Market Sectors
- Energy Retrofit
- Life Sciences
Services
- BIM/VDC
- Engineering
- Mechanical
- Controls & Automation