Project Summary

This project consisted of an all-electric mechanical system supporting the conversion of an existing high rise office building to 50-50 lab-office use. We installed new rooftop equipment including a 400-ton water-cooled chiller, cooling tower, 480-tons of air to water heat pumps providing CHW & HHW to lab floors, lab exhaust fans connected to heat recovery unit, and lab exhaust riser down former elevator shaft.

Market Sectors
  • Energy Retrofit
  • Life Sciences
Services
  • BIM/VDC
  • Engineering
  • Mechanical
  • Controls & Automation