We’re Hiring!

Why You Want to Work for Western Allied Mechanical

UCSF Parnassus – Moffitt Long Hospital Neuro IR Equipment Replacement

San Francisco, CA
Project Summary

Design-assist HVAC renovation supporting the Neuro IR equipment replacement at UCSF Moffitt Long Hospital. WAM’s scope includes preconstruction survey and investigation, mechanical demolition and safe-off, installation and modification of air handling and fan coil systems, chilled water piping, supply and exhaust ductwork, grilles and diffusers, Distech controls, seismic bracing, insulation, testing, air balancing, and HCAi/OSHPD-1 inspection support.

Market Sectors
  • Healthcare/HCAI
Services
  • Mechanical
  • Engineering
Connect With Us

Let us know about your next project or partnering needs.